Concrete-filled steel pipe bollards, core-drilled or footed, at loading docks, storefronts, gas islands, transformers and equipment. Installed by our own employees, on your schedule.
Winter offer: mention code WINTER10 for 10% off any job booked by December 31
Free written estimates. MA HIC #203912. Licensed and insured. Serving Eastern Massachusetts and Rhode Island.
Tell us how many, where they go, and whether there is slab underneath. We price off that and confirm within one business day.
“We had over 100 bricks on the front of our house that were either falling apart or in really rough shape. Concrete Solutions and Waterproofing came in and did a fantastic job replacing them.”


Spacing is usually four to five feet on centre so a vehicle cannot pass between them, tighter at a door jamb. We will walk the area or work off a photo and a measurement and tell you the count.
Yes. We core-drill, set the pipe, grout and fill. Where there is no slab, or the slab is too thin to hold a hit, we dig and pour a proper footing instead.
Always, before we mobilise, naming your entity or your property manager as certificate holder. MA HIC #203912, RI GC-49650.
Yes. Most commercial bollard work happens evenings or weekends so we are not blocking a dock door or a storefront during trading hours.